Frankfurt Homburger Damm -
Double-track expansion

-Track construction/superstructure
-19 points and 3 km of tracks
-5 signal brackets and 1 signal bridge
-93 lighting poles
-Earthworks 5,200 cubic metres

Order volume: EUR 32.1 million

Gaschwitz Markleeberg

-New construction of the platforms, incl. lighting system
-New construction of 4000 metres of noise barriers
-New construction of 46 points
-New construction of a passenger tunnel
-New construction of 4 railway viaducts
-New construction of 10 railway station tracks

Order volume: EUR 29.5 million

Railway infrastructure between

Naumburg (Saale) and Großheringen

-New construction of 2 railway bridges
-Renovation of 3 Saale flood bridges
-Establishment of an electronic interlocking system
-Track, points and overhead line work

Order volume: EUR 7.0 million

Bahnhof Wörth a.d.I.
Before                                                                                                                                                                      After



Bahnhof Bad Kreuznach
Before                                                                                                                                                                      After